How Much Does Rooftop Solar Cost in Uttar Pradesh in 2026 — and What Subsidy Can You Claim?
UP rooftop solar 2026: approximate 1–5 kW cost, PM Surya Ghar subsidy up to ₹78,000, UPNEDA state top-up up to ₹30,000, and UPPCL/PVVNL/NPCL net metering steps.
How Much Does Rooftop Solar Cost in Uttar Pradesh in 2026 — and What Subsidy Can You Claim?
Quick answer: In Uttar Pradesh, eligible residential rooftop systems under PM Surya Ghar can get central subsidy of ₹30,000 per kW for the first 2 kW, plus ₹18,000 for the 3rd kW, up to a maximum of ₹78,000 for 3 kW and above (general category). Over and above that, Uttar Pradesh’s published state support via UPNEDA is ₹15,000 per kW, capped at ₹30,000 per consumer — so a 3 kW home may see combined central + state support up to about ₹1,08,000 when both apply. You apply on pmsuryaghar.gov.in; net metering is processed with your local DISCOM under the UPPCL group (for example PVVNL, MVVNL, PuVVNL, DVVNL, KESCO) or NPCL in Noida / Greater Noida areas. Gross installed cost still depends on brand, structure and labour — treat the ranges below as approximate, not a quotation.
Homeowners in Lucknow, Kanpur, Varanasi, Prayagraj, Agra, Ghaziabad, Meerut and Noida ask the same three things: total cost, how much subsidy actually lands in the bank, and how net metering works with their DISCOM bill. This 2026 guide answers those points in plain English, without invented city statistics or fake testimonials.
Approximate Rooftop Solar Cost in Uttar Pradesh (1 kW to 5 kW)
Prices vary by panel brand (DCR modules are required for the central subsidy), inverter type, roof structure, wiring length and local labour. The figures below are approximate gross installed cost ranges for a standard on-grid residential system in Uttar Pradesh before subsidy. They are not a quotation.
| System size | Approx. gross cost (₹) | Typical use case | Rough roof space* |
|---|---|---|---|
| 1 kW | ₹55,000 – ₹80,000 | Small home / low bill (lights, fans, fridge) | ~6–8 m² |
| 2 kW | ₹1,10,000 – ₹1,50,000 | 1–2 BHK with moderate daytime load | ~12–16 m² |
| 3 kW | ₹1,60,000 – ₹2,20,000 | 2–3 BHK; common subsidy sweet spot | ~18–24 m² |
| 5 kW | ₹2,50,000 – ₹3,50,000 | Larger home, AC use, higher sanctioned load | ~30–40 m² |
*Roof space depends on panel wattage and layout. Shadow-free south or near-south facing roof is preferred.
After central CFA and any applicable UPNEDA state top-up, many 2–3 kW homes see a much lower net outlay. Size the system from your own monthly units — not from a neighbour’s plant. For a first estimate, browse more guides on our SolarConnect blog.
PM Surya Ghar Central Subsidy + UPNEDA State Top-Up
Uttar Pradesh is a general-category state for central financial assistance (CFA) under PM Surya Ghar: Muft Bijli Yojana. The widely published residential CFA structure is:
| System size | Central subsidy (CFA) | UP state subsidy (UPNEDA, if eligible) | Indicative combined support* |
|---|---|---|---|
| 1 kW | ₹30,000 | ₹15,000 | ₹45,000 |
| 2 kW | ₹60,000 | ₹30,000 (cap) | ₹90,000 |
| 3 kW and above | ₹78,000 (maximum CFA) | ₹30,000 (cap; no extra state slab for the 3rd kW in published booklet tables) | Up to about ₹1,08,000 |
*Combined figures follow UPNEDA’s published PM Surya Ghar information booklet tables. Always confirm live amounts on pmsuryaghar.gov.in and upneda.org.in before you pay any vendor.
Key points:
- Central CFA: ₹30,000/kW up to 2 kW, ₹18,000 for the 3rd kW, maximum ₹78,000 for 3 kW and above.
- UP state support published by UPNEDA / UP Solar Policy: ₹15,000 per kW, maximum ₹30,000 per consumer, over and above central CFA when eligibility is met.
- Subsidy applies to eligible residential rooftop systems that follow scheme rules (including DCR / ALMM-listed modules where required).
- CFA is released after DISCOM inspection/approval and the consumer completes bank details and redeem steps on the national portal — not at the time of application.
- State top-up timing and portal steps can differ from central CFA; UPNEDA is the state nodal agency.
Comparison: What Changes From 1 kW to 5 kW in UP?
| Topic | 1–2 kW | 3 kW | 5 kW |
|---|---|---|---|
| Rough gross cost | ₹55k–₹1.5 lakh | ₹1.6–2.2 lakh | ₹2.5–3.5 lakh |
| Central CFA | ₹30,000 – ₹60,000 | ₹78,000 | ₹78,000 (capped; no extra CFA above 3 kW) |
| UP state top-up (if eligible) | ₹15,000 – ₹30,000 | ₹30,000 (cap) | ₹30,000 (cap) |
| Often fits | Low–moderate bills | Typical 2–3 BHK sweet spot | Higher AC load / larger roof |
| Net metering | Same DISCOM path | Same DISCOM path | Same path; size must fit sanctioned load / roof rules |
Installing 5 kW can still make sense for generation and bill savings, but central CFA does not rise above the 3 kW amount of ₹78,000. For a parallel state walkthrough, see our Maharashtra guide: Rooftop Solar in Maharashtra 2026 — Cost, Subsidy and MSEDCL Net Metering.
UPPCL / PVVNL Net Metering: What Homeowners Should Expect
Most of Uttar Pradesh is served by DISCOMs under the UPPCL group — including PVVNL (Paschimanchal), MVVNL (Madhyanchal), PuVVNL (Purvanchal), DVVNL (Dakshinanchal) and KESCO (Kanpur). Parts of Noida / Greater Noida are served by NPCL. Subsidised residential applications go through pmsuryaghar.gov.in and then your DISCOM’s rooftop / net-metering workflow. UPNEDA is the state nodal agency for scheme coordination.
Under UPERC rooftop solar PV regulations, eligible residential consumers can use net metering: surplus generation is credited against grid consumption through a bidirectional meter arrangement. Settlement-period details and any payment rate for leftover credits are set by current UPERC / DISCOM rules and can change — confirm on your DISCOM’s latest circular or UPNEDA FAQ before you plan around a specific ₹/kWh figure.
Typical PM Surya Ghar + DISCOM steps in UP
- Register on the national portal at pmsuryaghar.gov.in with your consumer number and mobile (OTP login).
- Feasibility / application moves to your DISCOM (for example PVVNL or NPCL) as per the scheme process for your connection.
- Select an empanelled vendor listed for your DISCOM on the portal (do not pay “speed-up” agents).
- Installation of DCR-compliant modules, inverter and structure as per agreement.
- Net meter / generation meter testing and installation through the DISCOM’s metering process.
- Joint inspection / commissioning with the DISCOM; keep the joint inspection report and documents.
- Portal updates for installation details, then bank details and Redeem Subsidy after approval; state top-up, where applicable, follows UPNEDA’s process after commissioning documents are in order.
How to Apply on pmsuryaghar.gov.in (Uttar Pradesh)
- Open pmsuryaghar.gov.in (official government site only).
- Use Consumer Login with your registered mobile number, captcha and OTP.
- Enter your electricity consumer details as printed on your UPPCL-group or NPCL bill.
- Complete the application / feasibility steps shown on the dashboard.
- Choose a registered vendor for your UP DISCOM area.
- After installation and DISCOM approval, submit bank details and redeem the central subsidy on the same portal.
- For delays after approval, use portal grievance options or the national helpline 15555.
Keep UPNEDA’s official pages (upneda.org.in) bookmarked for state-subsidy and vendor guidance alongside the national portal.
Which System Size Suits Key UP Cities?
City names below are for orientation only. The right size depends on your monthly units, sanctioned load and shadow-free roof — not on the city name alone.
| Area | Often fits | Why (practical note) |
|---|---|---|
| Lucknow | 3–5 kW | Many 2–3 BHK homes with daytime AC and mid–high bills |
| Kanpur (KESCO / nearby) | 2–5 kW | Mix of compact and larger roofs; size to bill and load |
| Varanasi / Prayagraj | 2–3 kW | Common starting point for mid-size residences |
| Ghaziabad / Meerut (PVVNL belts) | 3–5 kW | Higher summer load in many homes; check terrace shadow |
| Noida / Greater Noida (NPCL) | 2–5 kW | Society NOC and roof rights often decide feasibility first |
| Agra | 2–3 kW | Practical entry size for moderate consumption |
Apartment societies need clear NOC and common-area or allotted roof rights before you apply. Individual houses with open terrace are usually simpler for metering and structure.
Documents and Mistakes to Avoid
Keep ready: latest paid bill, ID linked to the portal mobile, bank proof for subsidy, roof ownership or society NOC, and the vendor agreement with panel/inverter details. Avoid non-DCR panels if you want CFA, do not install before feasibility is clear, check terrace shadow, size from your own bill, and complete bank details plus Redeem Subsidy after DISCOM approval. Do not treat any WhatsApp “guarantee” of subsidy amount as final — only the portal and UPNEDA / DISCOM confirmation count.
How SolarConnect Helps (Pan-India Dealer Network)
SolarConnect (Techsr Enterprise, Serampore) supports Uttar Pradesh homeowners and local partners with surveys, vendor coordination and PM Surya Ghar documentation across India. Browse every public guide on our site directory, or read more rooftop explainers on the SolarConnect blog before you call.
Talk to the SolarConnect Team
Planning rooftop solar in Uttar Pradesh or joining as a local partner? Call for a no-obligation discussion on system size, subsidy steps and next documents.
📞 Call the SolarConnect team: 033 3183 5203 | âœ‰ï¸ Contact form | 🤠Partner with us
Note: Costs are approximate. Scheme rules, CFA amounts, UPNEDA state top-up, DISCOM circulars and net-metering regulations can change. Confirm current figures on pmsuryaghar.gov.in, upneda.org.in and your DISCOM before you pay any vendor. This article is informational, not a government notice or price offer. Updated for October 2026.
Frequently Asked Questions
How much subsidy do I get for rooftop solar in Uttar Pradesh under PM Surya Ghar?
Central CFA is ₹30,000 per kW for the first 2 kW and ₹18,000 for the 3rd kW, with a maximum of ₹78,000 for 3 kW and above. UPNEDA’s published state top-up is ₹15,000 per kW, capped at ₹30,000 per consumer. A 3 kW home may see combined support up to about ₹1,08,000 when both apply — confirm live amounts on the official portals.
What is the approximate cost of a 3 kW solar system in Uttar Pradesh?
A typical on-grid 3 kW residential system often falls roughly between ₹1.6 lakh and ₹2.2 lakh before subsidy, depending on brand, structure and labour. After central CFA (and state top-up if eligible), many homes see a lower net outlay. Always get a site-specific quote.
Which DISCOM handles net metering for my UP home?
Most of the state is under UPPCL-group DISCOMs such as PVVNL, MVVNL, PuVVNL, DVVNL and KESCO. Noida / Greater Noida areas may be under NPCL. Your electricity bill shows the licensee name — use that when applying on pmsuryaghar.gov.in.
Where do I apply for PM Surya Ghar in Uttar Pradesh?
Apply on pmsuryaghar.gov.in using Consumer Login. Your application is processed with your local DISCOM. UPNEDA is the state nodal agency for scheme coordination and state-subsidy steps. Use only official government websites and an empanelled vendor.
Is 3 kW enough for a home in Lucknow or Ghaziabad?
For many 2–3 BHK homes with moderate bills, 3 kW is a common starting point and matches the central subsidy cap. Homes with heavy AC use or higher sanctioned load may need 5 kW. Size from your monthly units and roof space, not from the city name alone.
Can apartment societies in Noida install rooftop solar?
Yes, if the society grants NOC and roof rights and the connection type fits NPCL / scheme rules. Space and shadow are often the limiting factors, so a survey comes before any deposit.