Maharashtra Rooftop Solar 2026: Cost & ₹78,000 Subsidy
Get up to ₹78,000 PM Surya Ghar subsidy on rooftop solar in Maharashtra. See 2026 cost for 1–5 kW and MSEDCL net metering steps. Free site survey.
Rooftop Solar in Maharashtra 2026: Cost, Subsidy and MSEDCL Net Metering Explained
In 3 lines: Central PM Surya Ghar subsidy is ₹30,000/kW up to 2 kW plus ₹18,000 for the 3rd kW (max ₹78,000).
Apply on pmsuryaghar.gov.in, pick an empanelled vendor, then complete MSEDCL net metering.
Check your system size free with our solar calculators, or call +91 92823 67700 for a site survey.
Quick answer: In Maharashtra, a residential rooftop solar system under PM Surya Ghar can get central subsidy of ₹30,000 per kW for the first 2 kW, plus ₹18,000 for the 3rd kW, up to a maximum of ₹78,000 for 3 kW and above (general category). You apply on pmsuryaghar.gov.in, choose an empanelled vendor, and complete net metering with MSEDCL (Mahavitaran) through its I-SMART / renewable-energy process. Gross installation cost for a typical home system usually falls in the ranges below — always treat them as approximate and confirm with a site survey.
Across Pune, Mumbai suburbs, Nagpur, Nashik, Chhatrapati Sambhajinagar (Aurangabad) and Kolhapur, homeowners ask the same three things: cost, subsidy and MSEDCL net metering. This 2026 guide answers those points in plain English, without invented city statistics.
Approximate Rooftop Solar Cost in Maharashtra (1 kW to 5 kW)
Prices vary by panel brand (DCR modules are required for the central subsidy), inverter type, roof structure, wiring length and local labour. The figures below are approximate gross installed cost ranges for a standard on-grid residential system in Maharashtra before subsidy. They are not a quotation.
| System size | Approx. gross cost (₹) | Typical use case | Rough roof space* |
|---|---|---|---|
| 1 kW | ₹55,000 – ₹80,000 | Small flat / low bill (lights, fans, fridge) | ~6–8 m² |
| 2 kW | ₹1,10,000 – ₹1,50,000 | 1–2 BHK with moderate daytime load | ~12–16 m² |
| 3 kW | ₹1,60,000 – ₹2,20,000 | 2–3 BHK; common subsidy sweet spot | ~18–24 m² |
| 5 kW | ₹2,50,000 – ₹3,50,000 | Larger home, AC use, higher sanctioned load | ~30–40 m² |
*Roof space depends on panel wattage and layout. Shadow-free south or near-south facing roof is preferred.
After the central subsidy (see next section), many 3 kW homes see a lower net outlay. For a personalised size based on your bill, use our free solar calculator.
PM Surya Ghar Central Subsidy for Maharashtra Homes
Maharashtra is a general-category state for the central financial assistance (CFA) under PM Surya Ghar: Muft Bijli Yojana. The widely published residential CFA structure is:
| System size | Central subsidy (CFA) | How it is calculated |
|---|---|---|
| 1 kW | ₹30,000 | ₹30,000 × 1 kW |
| 2 kW | ₹60,000 | ₹30,000 × 2 kW |
| 3 kW and above | ₹78,000 (maximum) | ₹60,000 + ₹18,000 for the 3rd kW |
Key points:
- Subsidy applies to eligible residential rooftop systems that follow scheme rules (including DCR panels where required).
- CFA is released after DISCOM inspection/approval and the consumer completes bank details and redeem steps on the national portal — not at the time of application.
- Any Maharashtra state top-up (if announced) can change. Always confirm the latest amount on pmsuryaghar.gov.in or with MSEDCL. For a pan-India view, see our state-wise solar subsidy guide.
Subtract the CFA from your vendor quote for an indicative net outlay. Systems above 3 kW still get a maximum of ₹78,000 central CFA under the standard residential slab.
MSEDCL Net Metering: What Homeowners Should Expect
MSEDCL (Mahavitaran) is the DISCOM for most of Maharashtra. Subsidised rooftop applications go through pmsuryaghar.gov.in and MSEDCL’s rooftop / I-SMART workflow. Net metering uses a bidirectional meter so export and import are adjusted under current MSEDCL / MERC rules — circulars can change details, so treat the steps below as the usual path, not a legal summary.
Typical MSEDCL / PM Surya Ghar steps
- Register on the national portal at pmsuryaghar.gov.in with your consumer number and mobile (OTP login).
- Feasibility / application moves to MSEDCL as per the scheme process for your connection.
- Select an empanelled vendor listed for your DISCOM on the portal (do not pay “speed-up” agents).
- Installation of DCR-compliant modules, inverter and structure as per agreement.
- Net meter / generation meter testing and installation through MSEDCL’s process (including subdivision/division or AMISP routes where notified).
- Joint inspection / commissioning with MSEDCL; keep the joint inspection report and documents.
- Portal updates for installation details, then bank details and Redeem Subsidy after approval.
MSEDCL also publishes rooftop guidance and status tools on its I-SMART / renewable-energy pages (mahadiscom.in). For non-subsidy rooftop, a separate I-SMART route exists — ask your vendor which path matches your case.
How to Apply on pmsuryaghar.gov.in
- Open pmsuryaghar.gov.in (official government site only).
- Use Consumer Login with your registered mobile number, captcha and OTP.
- Enter your electricity consumer details as printed on the MSEDCL bill.
- Complete the application / feasibility steps shown on the dashboard.
- Choose a registered vendor for Maharashtra / MSEDCL.
- After installation and DISCOM approval, submit bank details and redeem the subsidy on the same portal.
- For delays after approval, use portal grievance options or the national helpline 15555.
More detail on stages and delays is in our PM Surya Ghar subsidy status guide and the application and loan process guide.
Which System Size Suits Key Maharashtra Districts?
District names below are for orientation only. The right size depends on your monthly units, sanctioned load and shadow-free roof — not on the city name alone.
| Area | Often fits | Why (practical note) |
|---|---|---|
| Pune (city & PCMC belts) | 3–5 kW | Many 2–3 BHK homes with daytime AC and higher bills |
| Mumbai suburbs (MSEDCL areas) | 2–3 kW | Limited terrace space; check society NOC and shadow |
| Nagpur | 3–5 kW | Strong summer load; roof space often more available |
| Nashik | 2–5 kW | Mix of homes and semi-urban roofs; size to bill |
| Chhatrapati Sambhajinagar (Aurangabad) | 3–5 kW | Good for homes with open terrace and mid–high consumption |
| Kolhapur | 2–3 kW | Common starting point for mid-size residences |
Apartment societies need clear NOC and common-area or allotted roof rights before you apply. Individual bungalows are usually simpler for metering and structure.
Quick Comparison: Cost, Subsidy and Metering
| Topic | What to remember in Maharashtra |
|---|---|
| Gross cost | Approx. ₹55k–₹80k per kW band for small systems; 5 kW often ₹2.5–3.5 lakh — site quote required |
| Central subsidy | ₹30k/kW up to 2 kW; ₹18k for 3rd kW; max ₹78,000 |
| DISCOM | MSEDCL (Mahavitaran) for most of the state |
| Application | pmsuryaghar.gov.in + MSEDCL I-SMART / rooftop process |
| Net metering | Bidirectional meter after feasibility, install and joint inspection |
| Sweet spot | Often 3 kW for subsidy cap + typical home load |
Documents and Mistakes to Avoid
Keep ready: latest paid bill, ID linked to the portal mobile, bank proof for subsidy, roof ownership or society NOC, and the vendor agreement with panel/inverter details. Avoid non-DCR panels if you want CFA, do not install before feasibility is clear, check terrace shadow, size from your own bill (not a neighbour’s system), and complete bank details plus Redeem Subsidy after MSEDCL approval.
How SolarConnect Helps (Pan-India Dealer Network)
SolarConnect (Techsr Enterprise, Serampore) supports Maharashtra homeowners and local partners with surveys, vendor coordination and PM Surya Ghar documentation. To bring local leads as a dealer, see our dealership and partner page and Maharashtra, Gujarat and Karnataka dealership.
Browse every public guide on our site directory, or size your system with the solar calculator before you call.
Talk to the SolarConnect Team
Planning rooftop solar in Maharashtra or joining as a local partner? Call for a no-obligation discussion on system size, subsidy steps and next documents.
📞 Call the SolarConnect team: 033 3183 5203 | 💬 WhatsApp the team | ✉️ Contact form | 🤝 Partner with us
Note: Costs are approximate. Scheme rules, CFA amounts, MSEDCL circulars and net-metering regulations can change. Confirm current figures on pmsuryaghar.gov.in and mahadiscom.in (I-SMART / renewable energy) before you pay any vendor. This article is informational, not a government notice or price offer. Updated for October 2026.
Frequently Asked Questions
How much subsidy do I get for rooftop solar in Maharashtra under PM Surya Ghar?
For general-category residential systems, central subsidy is ₹30,000 per kW for the first 2 kW and ₹18,000 for the 3rd kW, with a maximum of ₹78,000 for 3 kW and above. Confirm any state top-up on the official portal.
What is the approximate cost of a 3 kW solar system in Maharashtra?
A typical on-grid 3 kW residential system often falls roughly between ₹1.6 lakh and ₹2.2 lakh before subsidy, depending on brand, structure and labour. After ₹78,000 CFA, many homes see a lower net outlay. Always get a site-specific quote.
How does MSEDCL net metering work for rooftop solar?
After feasibility and installation, MSEDCL installs or configures a bidirectional net meter (and related meters as required). Units you export are adjusted against units you import as per applicable MSEDCL / MERC rules for your connection.
Where do I apply for PM Surya Ghar in Maharashtra?
Apply on pmsuryaghar.gov.in using Consumer Login. Your application is processed with MSEDCL for most of Maharashtra. Use only the official government website and an empanelled vendor.
Is 3 kW enough for a home in Pune or Nagpur?
For many 2–3 BHK homes with moderate bills, 3 kW is a common starting point and matches the central subsidy cap. Homes with heavy AC use or higher sanctioned load may need 5 kW. Size from your monthly units and roof space, not from the city name alone.
Can apartment societies in Mumbai suburbs install rooftop solar?
Yes, if the society grants NOC and roof rights and the connection type fits MSEDCL / scheme rules. Space and shadow are often the limiting factors, so a survey comes before any deposit.
Source: SolarConnect India – solar.thetechsr.com
Back to Solar Blog